Seton Bypass Project

Image of Seton Powerhouse and penstock
Seton powerhouse and penstock.

Seton Generating Station plays an important role in the Bridge River system that spans from Gold Bridge to Lillooet. We're planning to replace the generator and turbine at the Seton Generating Station in Lillooet that are nearing end of life.

What's new

Join us at our virtual open houses

The final phase of engagement is underway for our Bridge River and LaJoie Access and Accommodation Studies looking at access and transportation, worker accommodation, and potential socioeconomic impacts related to our Bridge River capital project work.

We’re hosting three virtual open houses throughout May and June.

  • Find out what the leading options are for access and accommodation.
  • Learn how we’ve incorporated St'át'imc, stakeholder, and public feedback into the overarching recommendations and Structured Decision Making (SDM) process.
  • Understand how this information will be used going forward. 

You'll also have an opportunity to ask questions and share your feedback ahead of the release of these reports this summer.
 

Virtual open house details

Lillooet - Bridge River Access and Accommodation Study

Monday, May 27, 2024
5 p.m. to 6 p.m.

Seton Portage - Bridge River Access and Accommodation Study

Wednesday, May 29, 2024
5 p.m. to 6 p.m.

Upper Bridge River Valley - La Joie Access and Accommodation Study

Monday, June 3, 2024
5 p.m. to 6 p.m.

A Microsoft Teams meeting link will be sent prior to the sessions.
 

Register for the virtual open houses

 

We've begun plans to replace the generator and turbine at the Seton Generating Station in Lillooet that are nearing end of life. The generator was first installed in 1956 and the turbine was replaced in 1977.

Upgrading the facility will help ensure our system continues to operate safely. Seton Generating Station plays an important role in the Bridge River System that spans from Gold Bridge to Lillooet. For decades it has operated at the downstream end of the system in Lillooet generating electricity and serving as a main source of water conveyance for the Bridge River system moving water from Seton Lake and into the Fraser River.

In addition to the new generator and turbine, we're also planning to install a hydraulic bypass. The hydraulic bypass is expected to be in place for approximately 12 months while construction is underway to help ensure water can continue to move from Seton Lake to the Fraser River. It will also help mitigate risk of impact to fish and maintain our flow commitments in the Water Use Plan.

This is a multi-year construction project and we anticipate the need for additional workers to support various aspects of the project.

  • 2025-2026: Approximately 40 temporary workers to complete the hydraulic bypass
  • 2026-2027: Approximately 30 temporary workers for the unit replacement

Local accommodation for our workers is the priority wherever possible. Accommodations will be coordinated by the contractor in the implementation phase of the project.
 

The Seton Dam and Powerhouse (Seton Lake) in Lillooet is the part of BC Hydro's Bridge River system which is located 300 km north of Vancouver in the traditional territory of the St'át'imc Nation. As the project moves forward, we'll provide updates to the local communities on the project activities and any impacts.

Planning for the Seton Unit Replacement Project is currently underway. Construction of the bypass is expected to take place in 2026. Work on the generator and turbine replacement is targeted to be complete in 2027.

 

Early planning estimates the project will be in excess of a $100 million. The project is expected to apply for a Certificate of Public Convenience and Necessity with the BC Utilities Commission.

Environmental impacts studies are underway, and considerations will be shared soon with project stakeholders.